YAS Academy

Specialist wellhead learning path

Chapters and lessons follow their prerequisite order. Start with Lesson 1 or open the chapter you need.

A continuous learning path

From the subsurface and drilling to wellhead equipment

Five chapters progress from subsurface and drilling fundamentals to casing and wellhead equipment.

01

Earth, petroleum, reservoirs and the well

The vocabulary and mental model required before studying drilling, casing and wellhead equipment.

02

Drilling, casing and the wellhead interface

The logic of casing programmes, cementing, string suspension and handover to the wellhead team.

  1. Lesson 13Why does a well need casing?Open lesson
  2. Lesson 14Casing-programme architectureOpen lesson
  3. Lesson 15Cement and zonal isolationOpen lesson
  4. Lesson 16Casing hangers and the load pathOpen lesson
  • Casing programme and well sections
  • Cementing, casing hangers and load path
  • Casing Head, Casing Spool and Tubing Head
  • Completion, handover and stage records
03

Tubing hangers and completion interfaces

Suspension, sealing, penetrations and the records needed to understand tubing hangers.

  1. Lesson 17The completion string and production tubingOpen lesson
  2. Lesson 18Tubing-head spool and annulus accessOpen lesson
  3. Lesson 19Tubing hanger: load, seal and penetrationsOpen lesson
  4. Lesson 20Tubing-hanger installation, testing and handoverOpen lesson
  • Mandrel and slip-type hangers
  • Seals, lockdown and control penetrations
  • Selection, installation and acceptance records
04

Interfaces and adapter flanges

Understanding the interface between the tubing head and upper equipment without generalising one arrangement to every manufacturer.

  1. Lesson 21Adapter-flange position in the stackOpen lesson
  2. Lesson 22Connection families and sealing surfacesOpen lesson
  3. Lesson 23Interface compatibility and verificationOpen lesson
  • Adapter-flange position in the stack
  • Flanged, studded, threaded and clamp interfaces
  • Size, pressure-class and seal compatibility
05

Wellhead equipment and tree-arrangement reading

Placing valves, outlets, hangers and tree components within a coherent equipment arrangement.

  1. Lesson 24Reading the wellhead stack bottom-upOpen lesson
  2. Lesson 25Christmas-tree valves and flow pathsOpen lesson
  3. Lesson 26Chokes, tree cap and surface safetyOpen lesson
  4. Lesson 27Reading and verifying a complete wellhead arrangementOpen lesson
  • Bodies, spools, hangers and packoffs
  • Valves, outlets and flow paths
  • Reading a complete wellhead and Christmas Tree arrangement