YAS Academy · Wellhead pathway

Chapter 3 · Lesson 17 · T01

The completion string and production tubing

A controlled production conduit inside casing

Production tubing is the principal production or injection conduit; casing, annuli and completion equipment provide pressure boundaries and serviceability around it.

Teaching schematic of system pathsNot to scale or manufacturer-specific; operations require the approved well-specific GA, P&ID and procedure.

The real question

Why not simply produce directly through the casing?

Tubing provides a replaceable conduit sized for rate and service while limiting direct operational exposure of the casing. Its actual selection follows the completion design, not a universal diameter.

01Mechanical load
02Pressure boundary
03Production path
04Annulus / control

Technical model

01

Production conduit

Fluid enters the tubing through the completion and travels to surface within a defined conduit. Downhole equipment may control flow, safety or isolation.

02

Annulus

The tubing-casing annulus is not the normal production path; its pressure is monitored and managed, and unintended communication can indicate a barrier problem.

03

Load and pressure handover

At surface, tubing weight, bore pressure and annulus pressure are handed to the tubing hanger and tubing head—the start of the wellhead interface.

Controlled sequence

From identification to evidence

  1. 01Completion design
  2. 02Run tubing
  3. 03Land hanger
  4. 04Seal and test

Field application

What does this change in the field?

Before wellhead installation, confirm the completion programme, OD/ID, connection, suspended load, fluid service and control penetrations.

Glossary

Key terms

Production tubing
Serviceable inner string for production or injection.
Annulus
The annular space between concentric boundaries.

Learning check

Reason through the operating case

If annulus pressure tracks tubing pressure, what hypotheses should be investigated?

Answer and reasoning

Check instrumentation and thermal effects first, then possible communication through seals, hanger, packer or tubing; do not conclude without testing and data.

Technical sources

The sequence is based on Eng. Kamal Deilami’s wellhead equipment reference and cross-checked against official manufacturer and technical sources. It does not replace manufacturer instructions or the approved well programme.