Execution experience

A track record built through operations reports

YAS project records are retained with traceable field reports, contracts and handover documentation.

01

Representative work areas

  • Wellhead equipment installation and completion
  • Casing spool and related equipment installation
  • Wellhead technical consultancy and supervision
  • Pressure testing and leak control
  • Project-item readiness and delivery
02

Project confidentiality

Client names, well numbers, technical details and records are published only with approval. This public website focuses on scope and execution method.

03

Evidence retained

  • Work completion reports
  • Mission and meeting records
  • Technical and test documents
  • Contract and delivery records

From the field

Real operations, documented with context

These images are selected from YAS's operational archive. Confidential well data, contractual documents and personal information are intentionally excluded.

YAS team installing wellhead equipment
Field commissioning of wellhead equipment
FIELD / 01

Wellhead installation and commissioning

Operating field — Iran

Preparation, installation, equipment alignment, connection checks and phased handover of wellhead operations.

Installed Christmas Tree assembly beside a rig
YAS technical team supervising field work
FIELD / 02

Christmas Tree field support

Rig site — Iran

Technical supervision, equipment configuration checks, test readiness and final-condition recording.

Wellhead valve maintenance operation
Work on a wellhead valve assembly
FIELD / 03

Wellhead valve maintenance

Controlled disassembly, component inspection, servicing and preparation for reinstallation and retesting.

Night-time lifting of wellhead equipment
Completed wellhead equipment in the field
FIELD / 04

Lifting, installation and equipment handover

Lifting coordination, safe equipment positioning, final checks and documented handover.

Selected experience

Names across the YAS track record

Machine Sazi Arak
Servok Kish
Darya Sahel
Petro Sina Aria
Behsazan Jonoob

Discuss a project